Author Archive

Highlights The Governor General of Canada, Her Excellency Julie Payette, visited PIP2IT on April 26th. David Longuevergne has been appointed as the IPNO Technical Coordinator. Initiated preliminary design cycle for transfer line dipoles and quadrupoles. Interface Control Documents are being created for HWR, Cryo Plant, Cryo Distribution System, Conventional Facilities. Cryo Plant Building Requirements Proposal… More »

Highlights ANL successfully qualified HWR cavity #3. Qualified SSR1 cavities S113 and S114 with low power RF coupler at STC. PIP2IT continues to increase beam power (now at 3.5 ms, 5mA, 20 Hz); construction of the east wall of cave was completed, preparing for cryo transfer line piping; facility was visited by Steve Binkley on… More »

Highlights Qualified first SSR1 cavity with high power RF coupler and tuner at STC. The PO for the Site Prep package has been signed by the A/E (Gensler). Official kick-off meeting is expected before the end of the month. PIP-II Technical Workshop with CEA/CNRS-IN2P3 France took place at Fermilab on April 9. PIP-II team visited… More »